Case Study: Improving Self-Perform Inspection Processes to Reduce Concrete-Induced Rework
- Verifying Concrete Self-perform work meets ACI and Contract Document Requirements
- Streamlining the handover to other trades with minimal rework
- Uncovering steel erector requirements to be set up for success