Case Study: Improving Self-Perform Inspection Processes to Reduce Concrete-Induced Rework

  • Verifying Concrete Self-perform work meets ACI and Contract Document Requirements
  • Streamlining the handover to other trades with minimal rework
  • Uncovering steel erector requirements to be set up for success