Case Study: Rethinking Quality Control on Prefabricated Electrical & Mechanical Components to Reduce Duplication of Inspection Efforts Across GCs & Trades

  • Assessing vibration and transit impacts on sensitive electrical components 
  • Defining which inspections remain valid before shipping and which require revalidation on-site 
  • Consulting manufacturers on tolerances, testing procedures and common failure points to minimize installation issues