Preventing Costly Envelope & Concrete Failures by Proactively Managing Water Intrusion & Thermal Risk

  • Targeting Divisions 7 and 3 as high-impact risk areas where failures are expensive to remove and replace, driving significant project cost exposure
  • Implementing practical plan-review techniques, including physically tracing water pathways through details, to validate how systems drain and perform
  • Moving from assumed understanding to deliberate verification of building envelope performance to prevent rework, leakage issues and thermal failures before construction begins